Showing posts with label Mitten. Show all posts
Showing posts with label Mitten. Show all posts
Thursday, December 18, 2008
Tuesday, December 16, 2008
Second Mitt Cont.
Finished the body, and am now working on the thumb - first went the wrong way with knitting the thumb - so it'll have a ring of garter at the base, but think I'll likely drop stitches if I go back - so onward.
Am contemplating ripping out the ribbing on the hat that I started to go with the mitts, and knitting down from the stockinette. I did 1x1 and the gauge went way too big, really should have gone down a needle size (another lesson learned).
Am contemplating ripping out the ribbing on the hat that I started to go with the mitts, and knitting down from the stockinette. I did 1x1 and the gauge went way too big, really should have gone down a needle size (another lesson learned).
Sunday, December 14, 2008
Second Mitt Progress
At first the second mitt seemed to be flying.. But with accidentally losing my fifth needle in the pencil section of a desk drawer for a day (and spending too much time looking for it), and having to go back several rows more than a few times (for some reason I get going and forget to strum).
And finally, wasted time today pulling out the waste yarn on the thumb hole, and then threading it through the empty loops. I just wanted to be able to put my hand in the mitt properly and see how I'm doing. (And it's fun.) :)
And finally, wasted time today pulling out the waste yarn on the thumb hole, and then threading it through the empty loops. I just wanted to be able to put my hand in the mitt properly and see how I'm doing. (And it's fun.) :)
Wednesday, December 10, 2008
Second Mitten
Correcting some mistakes with the second mitten. I've K4, M1 instead of K3 M1, and so the hand is a bit smaller, and is knitting up a bit faster. I'm already to the thumb row, and am comtemplating using waste yarn for the stitches and removing it when I'm ready to knit the thumb.
I'm juggling too many projects now, but I'm making sure to knit a little on each daily, so that they are working towards the end. I think gauge might be a bigger factor on speed than I thought. The size 3 silverlume twisted rib hat takes more out of my hands than the size 6 silverlume ribbed hat...
Checked out Etsy, and there is some pretty cheap alpaca roving out there... Am comtemplating making a traditional pair of strummed mitts with that...
I'm juggling too many projects now, but I'm making sure to knit a little on each daily, so that they are working towards the end. I think gauge might be a bigger factor on speed than I thought. The size 3 silverlume twisted rib hat takes more out of my hands than the size 6 silverlume ribbed hat...
Checked out Etsy, and there is some pretty cheap alpaca roving out there... Am comtemplating making a traditional pair of strummed mitts with that...
Sunday, December 7, 2008
First Mitten Done
Just finished knitting the thumb. Took out the first attempt, as it was way too big (going to shrink the number of stitches in the thumb hole next time), still oversized enough to comtemplate lining it with the wool. But that was after k1 k2tog for the first pink row. Think I would be happier with merlot color, but would have to order that..
Friday, December 5, 2008
Brown Tufted Mittens cont.
Wednesday, December 3, 2008
Startitis or a new hat, and my first attempt at a mitten...
I've started another hat, since I finished the Aran one. I am thinking of making another tam, but now am uncertain. See my 1x1 Rib is far too loose. I'd added a few extra stitches at the beginning and had hoped a section of ribbing would correct the issue, but it seems there will at least be elastic and perhaps felting in this hat's future.
I've also started with a mitten, in the same yarns. I've never knit one before, but the
Subscribe to:
Posts (Atom)



